Summer 2012
Banner 2
 

President's Corner

Well........quite a bit happening here at "World Headquarters".  We recently launched a "DCI Green" initiative in our office.  PLEASE see what you can do too.......it's easy!

  • Recyclables.  We now recycle nearly ALL paperwork................and the amount we print has been greatly reduced; thanks to the i.t./computer world.  It's weird not printing everything and placing in a manila folder and filing cabinet, isn't it?
  • Energy savings. We continue to monitor our electricity usage.  Turn off your computer and/or monitor(s) when not in the office; if you have double-switched lights, do you really need both rows of lights on?  How about natural day light?  
  • Water usage.  Please be "on the lookout" for leaky faucets, toilets, water heaters, etc.  Contact your property manager or us for facilities service.  Water is going to be a priced commodity in the future; so we have to conserve NOW.
 

DCI opens "satellite" office

Quite a few of our colleagues live in the East Bay.  Instead of "fighting traffic" for hours, which is typical in the Bay Area, we rented an office from the Alameda County Builder's Exchange.  If you ever need a place to "borrow" in San Leandro, please let us know.  Otherwise, Steve Souza and/or Sara Morgan are frequently in the San Leandro office.  

 


Colliers Links for Life Poker Tournament

The Links For Life Foundation originated in Las Vegas in 1995 with the goal of bettering the lives of children. Among the many other charities, Colliers hosts the Links for life Poker Tournament. Contributers will compete to earn a wide variety of prizes for placing. Along with that, there is a huge assortment of raffle prizes which are generously donated.

For more information please check out: http://www.linksforlifeca.com/

Poker logo 2


 

 



 Asset Enhancement Offer 

Lighting Flyer 3

    There are millions of T12 lighting *fixtures left in Northern California’s industrial or warehouse buildings that will need to be replaced. Tenants and Owners will soon run out of replacement T12 lamps and be forced to retrofi*t at a higher cost. Until year end, PG&E’s energy efficiency rebates will cover about 25 percent of retrofi*t costs. The T12 rebate money is rapidly being used up, and PG&E is warning customers not to wait to replace these energy intensive lamps.
    If the facility you own or manage has not had a lighting retrofi*t or upgrade in 20 years, it is most likely T12 or a *first-generation T8 (rebates are being eliminated for both). The simplest way to identify an 8-foot T12 is that it is larger in diameter, with a single node at each end. The light from a T12 has a buff* or yellow tone. T12 is also come in 4-foot lengths and U-shaped.
    With PG&E’s rebates being eliminated, industrial and commercial facilities are scrambling to replace the T12 *fixtures with energy e*fficient T8s and T5s; and the market is being fl*ooded with inexperienced or unscrupulous contractors that don’t provide clear estimates or can’t complete a project.

If you own or operate a facility with conventional T12 systems, you will need to modernize them or replace them altogether. Don’t wait, and lose the opportunity for PG&E rebates.
 
        How It Works

     We will provide our clients with an efficiency and high-quality
T12 retrofi*t. We will:
 
• Do a site inspection and audit of existing fixtures.
 
• Provide a financial analysis that is accurate, maximizes
  PG&E rebates, and provides ROI, cost payback, and includes
  the IRS Energy Efficient Commercial Building Tax Deduction,
  or 179D (also known as EPACT).
 
• Schedule an installation time period that works for you.
  Usually our 3-man crews can do a 100,000 sq. ft. building
  in 2-3 weeks.
 
• Remove old fixtures and lamps; recycle as required by PG&E.
 
• Install new high-quality energy efficient lamps per Title 24
  and all applicable codes.
 
• Provide owner with all warranties, etc.
 
• Apply for PG&E rebates.
 
• Calculate and certify the Energy Efficient Commercial
  Building Tax Deduction, or 179D.
 
To schedule an appointment, please contact Sara Morgan, smorgan@doyleconstruction.com and/or ext. 115
 

Collaborative Space

    Creating the Right Setting for Effective Collaboration The “if we build it they will come” model of providing collaboration spaces for employees rarely works. Workplace experts will tell you that too many areas – perhaps millions of square feet – provided for collaborative work are empty much of the time. That’s millions of square feet costing organizations a small fortune to maintain, sitting empty and not meeting their desired goal of supporting the business. This disappointing utilization of space can have several causes including lack of management support for collaborative areas, the mismatching of available spaces and those looking for a place to do group work, not providing the right type of space for the right collaborative activities, or simply not performing the type of work that requires collaboration.




Talk about having a "crappy" day......


bad day

 

http://www.youtube.com/watch?v=_56MyHg8kcE&feature=youtube_gdata_player 
  




Mechanincs Lien Law Changes

   Contractors, subcontractors, material suppliers, design professionals, and all others who are entitled by statute to assert a mechanics lien for recovery for services or materials furnished to a work of improvement should be aware of significant changes to the mechanics lien law which will go into effect July 1, 2012. These changes are as a result of legislation signed into law by Gov.  Jerry Brown in September 2010. The legislation (A.B. 180) makes changes to the mechanics lien laws, and to other construction remedies such as stop notices, payment bonds and related claims.
 
   The substantive changes made by the new legislation to the former mechanics lien law are relatively modest. Two of the more substantive recent changes, which went into effect in 2011, include a change in the form of the mechanics lien claim and its method of service (Civil Code §3084). This change is retained in the new law, and will be re-codified as Civil Code §8416. Also retained in the new law is the 2011 requirement that claimant's record a lis pendens within 20 days of filing the lien foreclosure action (currently Civil Code §3146). 



 

Closing-"two things"

  1. Vacation.  Most of you know that we conducted a two week trek through the Midwest this summer.  We had a GREAT time.............and it was hotter than Hades................we set the local heat record just about everywhere we went.  Started in Denver where we were chased out by the wildfires.  Then we flew to Chicago, where it was a "nice and toasty" 105 degrees for the time we were there.  We then drove to St. Louis for a couple of days.......and baked while waiting to get into the St. Louis Arch monument.  Next we drove to Nashville, TN where we spent the day; before driving to Eastern Tennessee to spend several days with relatives during the 4th of July Holiday!  So..........a whirlwind and a lot of fun.........but oh that Midwest heat and humidity!  What a combination!
  2. I keep reminding myself that 50 years old isn't that bad.  This month, I participated in my first-ever Skype video conference.  Wow!  I'd heard about it, but oh the power of coordinating via video with a client in Connecticut and a collleague in Sacramento, while I was at the office.  Secondly, Doyle Construction, Inc. (DCI) as you know is ten years "old" as of May 2012.  We had a terrific turnout on May 17 for the 10 year celebration.  Thank you for attending and all of the kind words!
I thought you might enjoy a picture of me from 2002 when I started the company.  Enjoy!  (yes that's really me..........growing up in Indiana........circa 1968 +/-.  Ain't I cute?  (ha ha).



DD Kid 2


Thank you!

David 

 


 

 
 
davidedoyle
 
 
 